Tata BlueScope's PEB roofing solution for Hitech Corporation gives the building a global edge in terms of design, protection, and durability

Hitech Corporation is a leading rigid plastic packaging manufacturer with 13 manufacturing facilities in India, catering to a sizeable customer base across various industries. To further strengthen their foothold in the Indian sub-continent, with a portfolio of innovative and sustainable products, Hitech Corporation decided to set up a next facility in Mysore using the most advanced construction materials and methods, and as per international standards.

Hitech Corporation Facility

Fact File
Project: Hitech Corporation Ltd
Project Size: Over 8,000 sq.m
Location: Mysore
Roof System: MR-24® Roof System with 126 Rotary Vents
Building Solution: BUTLER® Building Systems
Consultants: Shah & Shah Consulting Engineers, Rajesh Shah Engineers & Consultants

Scope of Work

Tata BlueScope Steel's contribution in the PEB industry numbers more than 1500 structures, developed with over 8 million safe hours. The company's forte includes design, manufacture, supply and installation– all of which services are provided by its Building Solutions vertical. Hitech Corporation opted for Tata BlueScope Steel's BUTLER® Building System – an obvious choice given its global recognition for providing timely construction with superior results such as leak-proof performance and world-class safety standards.

Solution Offered

BUTLER® Building System with MR-24® roof system made from high strength COLORBOND® Steel was an ideal solution. The MR24 roof system provides 10 years of leak proof performance warranty and guaranteed superior functionalities such as higher column-free space, and a mezzanine floor along with Smartdek® decking profile. Value engineering helped in optimizing the overall design with improved economics. Around 126 Rotary Vents were provided on the roof as an effective and environment-friendly solution to meet the building's natural ventilation requirement.

Hitech Corporation Facility Mysore

Design Challenges Construction Challenges

Due to dependency on various external parameters, the team faced a number of challenges on site. Erection Methodology Outcome

The outcome of our consolidated efforts was a successful delivery of the Hitech Corporation project with best-in-class products and construction methodologies. Team work, collaboration, an effective planning methodology were the main catalysts for completion of the project. This resulted in repeat orders by Hitech Vizag that steered a patronage for multiple job orders, which Tata BlueScope bagged in a row.