The building is a multi-level 10 storeys mezzanine structure supporting various silos and equipment at different levels of mezzanine. On the top level of the mezzanine, a conveyer bridge structure has been constructed at a height of 45.1 m above the ground, which is spanning 32 m in resting. The major challenge faced during the execution of the conveyer bridge structure which is spanning 32 m was the erection of the bridge with complete assembly. By using center of gravity from the Tekla model of Conveyer Bridge, lifting points are provided to ensure perfect alignments and geometry during erection.
Complex and Multi-Level Steel Structure for Process Industries by Interarch
The building is a multi-level 10 storeys mezzanine structure supporting various silos and equipment at different levels of mezzanine. On the top level of the mezzanine, a conveyer bridge structure has been constructed at a height of 45.1 m above the ground, which is spanning 32 m in resting. The major challenge faced during the execution of the conveyer bridge structure which is spanning 32 m was the erection of the bridge with complete assembly. By using center of gravity from the Tekla model of Conveyer Bridge, lifting points are provided to ensure perfect alignments and geometry during erection.
- MGS Architecture March 2015